Machine overview
- Manufacturer
- Fette Compacting
- Model
- P2100
- Model year
- 2008
- Category
- Tablet Presses and accessories
Pre-owned technical asset
Control architecture reviewed; retrofit path can be planned around target site requirements before purchase or relocation.
Machine photo set
Front, process-area, control-panel and technical-detail views help buyers understand the machine condition before requesting deeper documentation or a retrofit assessment.
Control architecture reviewed; retrofit path can be planned around target site requirements before purchase or relocation.
Available for technical review
Machine documents
Technical sheets, inspection summaries and supporting files give buyers a clearer basis for comparing condition, documentation readiness and renewal scope.
Technical due diligence
Legacy PLC/HMI structure should be confirmed against target site standards before final scope.
Available documentation should be reviewed with electrical drawings, software backup status and maintenance records.
Mechanical condition, tooling interfaces, compression zone condition and safety circuits should be checked before commercial commitment.
Recommended as a retrofit-ready tablet press candidate for PLC/HMI renewal, alarm review and controlled commissioning.
Service level meaning
Suitable for a defined retrofit discussion. The machine can move into PLC/HMI, safety, drives, documentation and commissioning scope planning.
Validation-readiness review should cover recipe handling, alarm visibility, audit trail expectations and IQ/OQ support needs.
Request a technical review to clarify documentation availability, control architecture, validation readiness and the most practical renewal path.
The inquiry form starts with email only and then opens the next steps.
Start inquiry