Completed machine projects, organized for technical discovery.
Pharma-Motion project references are published as confidential, machine-focused summaries. Each record is written to help engineering, maintenance and procurement teams find similar retrofit, modernization or lifecycle-support experience without exposing customer-sensitive details.
Each page connects back to the same renewal logic: assess the machine, define a controlled retrofit path, support validation readiness, optimize operation and keep the asset maintainable after start-up.
Completed references
27 completed project families across pharma production platforms.
The list covers solid-dose processing, tablet press systems, filling and sterile-support equipment,
blister and cartoning lines, end-of-line packaging, inspection and control systems. Model names are
included only where the source project list identifies them.
Completed pharma processing project covering GEA Collette mixing and granulation equipment with a focus on maintainability, production continuity and lifecycle support.
Result: A controlled modernization path was prepared for solid-dose processing reliability and cleaner technical handover.
Completed project involving L.B. Bohle blending and handling equipment where equipment usability, process flow and technical continuity were reviewed together.
Result: The scope helped align blending and handling equipment with a more practical production support model.
Completed control system project for Fette tablet press equipment, focused on automation maintainability, HMI clarity and controlled retrofit planning.
Result: The work improved the technical path for control renewal while supporting audit trail readiness and operator handover.
Completed Fedegari FOWS washer-sterilizer project for sterile production support where equipment condition and validation impact needed careful review.
Result: The project connected washer-sterilizer renewal planning with controlled transition and documentation readiness.
Completed Pharmacode control and inspection systems project for packaging environments where code verification and inspection readiness were important.
Result: The project supported inspection and control readiness with attention to traceability, documentation and maintainable operation.
Technical references without exposing sensitive site details.
What visitors can compare
Manufacturer, machine category, platform group, general scope and delivery outcome. Customer names,
plant locations, product details and proprietary process information are intentionally excluded unless
explicit approval is given later.